Junction City Concrete

Concrete Parking Lot Building in Junction City KS - a lot that drains and holds up

Old asphalt rutting, potholes or puddles across your parking area? We build a concrete lot with a packed base that drains the way it should.

Request an estimate
Concrete patio with a round wood-burning fire pit, surrounded by four cushioned chairs beside a modern home.

What does it take to build a concrete parking lot in Junction City?

Concrete parking lot building in Junction City, KS starts below the surface, with a dug-out, packed base and a planned path for water, so the slab you park on holds its shape under turning cars and drains off with only a slight slope.

Calls to Junction City Concrete about a lot usually come from owners whose gravel or asphalt has rutted, holds puddles or breaks up where cars turn, or who have a new building that needs somewhere to park. The price moves with the size of the lot, how much dirt has to come out to reach solid ground, whether an old surface gets torn out first, how much drainage work the site needs and how heavy the traffic will be, and adding curbs or a concrete sidewalk to the door adds to it. The schedule turns on the city's permit and site steps, the weather on pour day and the cure, which keeps the lot closed for a while after the pour. I measure and walk the site with you, then send a written estimate with the figure for your lot.

How we handle concrete parking lot building

Before anything is priced, I ask whether garbage trucks, a dumpster or delivery trucks will use the lot, because that changes the design, from how thick the slab runs where they turn to how much rebar, the steel that holds the slab together if it cracks, goes in. Then we check where water runs across the site and set grades so it falls away from buildings and toward somewhere it can go. We dig out to firm subgrade, the ground the slab sits on, and pack the base in layers, since a base that's only raked level settles with the dirt under it and takes the slab down too. We pour early in the day when we can, because a top that dries out in midday heat turns weak and dusty later, then give it a broom finish, a light texture that gives tires and shoes grip in the wet. Control joints, the straight cuts that give the slab a place to crack where we chose, go in on time, and the slab cures, kept damp and closed off, until it's strong enough to use. The base is the part nobody sees on day one and the first thing people want to cut from a budget, and I'd rather spend your money there than on a fancy surface, because a nice finish on a weak base is still a cracked lot in a few winters.

Parking lots rarely come alone. A dumpster enclosure wall, a carport or an addition next to the lot sits on concrete footings, which we can set while the crew is already on site. If a building or slab the lot ties into has settled, foundation raising brings it back up so the new grades line up with it instead of following the low spot.

  • Lots that see only cars

    Offices, churches and apartment buildings whose lots carry mostly cars can usually go with a standard slab on a well-packed base. The money goes into the base and the drainage instead of extra thickness the traffic will never use.

  • Lots that trucks will use

    If a garbage truck empties a dumpster or delivery trucks back in, the lot usually needs a heavier section and more steel where they drive and turn. Sometimes that's only a truck lane and a dumpster pad, so the rest of the lot doesn't carry the extra cost.

Concrete parking lot building in Junction City and what the city asks for

The city's Building and Codes office takes permit questions, and the city says its permit list shows just a few of the things that need one, so the list alone won't settle it for a parking lot. I check with the city or county office on each job, and when a permit's needed we pull it before work starts and call in the inspections as the job reaches them. When the lot is part of new commercial construction, the city's commercial construction requirements ask for a site plan prepared and signed by a registered Kansas design professional, showing existing easements, where water will drain and how erosion will be controlled, and we build the lot to match that drawing. The city can stop work until erosion and sediment control is in place, and it won't inspect until that control is set and the street is clear of mud and construction debris, so it goes in before we dig and the road gets cleaned as we go. The storm water plan also stays on site until 70 percent of the whole site is covered in vegetation.

We're based in Junction City and work in the cities around it, and the ground behaves much the same on lots in Manhattan and Abilene. Winters here freeze and thaw, and flat sites hold water after a hard rain, so we settle where the water goes before a single form is set.

Get a written estimate for your parking lot

We reply within one business day, and the on-site estimate is free with no obligation. I'll come out to measure and walk the lot with you, then send you a written estimate.

(785) 530-0068

Concrete parking lot questions in Junction City

Is a concrete parking lot worth the extra cost over asphalt?

For an owner who plans to keep the property a long time, usually yes. Across the industry, asphalt typically costs 20 to 40 percent less up front, but concrete lasts 25 to 40 years against 15 to 25 for asphalt, and because it needs less upkeep it often equals or beats asphalt on lifetime cost over 30 years or more. If you're selling in a few years, asphalt's lower upfront cost can make more sense, and I'll tell you that plainly.

How long before cars can park on a new concrete parking lot?

Plan on at least 7 days before a new concrete lot goes back into service, and 28 days before it reaches full strength. That's longer than most other surfaces need, so we help you plan where people will park while the lot stays closed to cure.

How do I keep a concrete parking lot from cracking when water freezes?

Ask whether the mix includes an air-entraining agent, an additive that puts tiny air pockets in the concrete. One research review rates it the most effective defense against freezing water, because the pockets give the ice room and cut the internal stress that leads to cracking. Good drainage helps too, since water that runs off can't sit in the slab and freeze, and we go over the mix with you before it's ordered.

Who do I ask about a parking lot permit in Junction City?

The city's Building and Codes office takes permit questions. I check with them on each job, as I said above, so you're not left working it out alone before the estimate.

How do I take care of a concrete parking lot?

Upkeep is light, because concrete has relatively simple maintenance needs. On a lot that mostly sees cars, the main wear usually comes from fuel and oil leaking from vehicles, rain runoff and deicing salt, so those are the things to keep an eye on.

What should I ask a concrete contractor before building a parking lot?

Ask how they'll prepare the base and handle drainage, and whether their crew holds flatwork certifications, the ones for slabs like lots and driveways. One industry model specification for parking lots calls for crews certified as Concrete Flatwork Technicians by the American Concrete Institute, led by a certified Concrete Flatwork Finisher, so it's a fair question for any bidder, along with the city license mentioned above.

Start your Junction City parking lot

Call (785) 530-0068, email hello@junctioncityconcrete.com or use the form with the lot's size, the vehicles it will serve, trucks included, and your timing, so the first visit covers the questions that shape the design.

(785) 530-0068
(785) 530-0068Request an estimate